CALL TOLL FREE : (800) 263-3112


Slips and trips are a major cause of injury. Increasing traction on your stairs and landing is one way you can help reduce the risk of slip and fall incidents.  If your facility is faced with the safety problem of slippery steps, click to read more!

The Back To School season is a time of fresh starts, getting into new routines and keeping to a schedule.  Gone are the lazy days of summer and with this “New Year” feeling upon us, we thought we’d share our 3 tips to help keep your next flooring project on schedule! 

Martin Collegiate High School, located in the Rosemont/Mount Royal neighbourhood in the north end of Regina, Saskatchewan, contracted StonCor Group to resurface flooring in order to repurpose a motor mechanic lab into a fitness lab.

A public elementary school was undergoing a renovation project and required a durable wall system to replace the existing coating. Due to the high traffic environment found in schools, the wall system needed to offer outstanding protection and also provide an attractive look.

A number of renovation projects will be happening in schools across Canada once the doors have closed for summer vacation.  The cafeteria is a high traffic environment that requires a high performance flooring system. Learn how Stonhard transformed a high school cafeteria into a visually interesting, easy to maintain space. 

Go

Categories

Automotive  /  4
Education  /  11
Healthcare  /  5
Hospitality  /  1
Marine  /  0
OEM  /  1
Oil and Gas  /  2
Power  /  6
Recreation  /  6
Retail  /  0
Technology  /  0

Archive

May 2017  /  2
April 2017  /  1
March 2017  /  1